Minibems Limited

BusinessGreen staff
clock • 1 min read

Minibems offers a Heat Network Management Service, enabled through the combination of an in-house developed hardware and software solution that merges heating control logic knowledge with embedded firmware capability.

The aim is provide users with a seamless customer proposition, which includes three main benefits:

Heating and hot water optimisation

Sophisticated software and control algorithms aim to optimise heat transfer rates within communally heated properties. The software driven demand-side controls significantly reduce the amount of heat going into properties, resulting in fuel cost reductions of 25-40 per cent.

Optimised service delivery

A remote management and bureau service enables failure prediction, data-driven decision making, remote problem solving and informed customer service through a transparent open protocol, leading to savings on call outs and reduced network running costs.

Minibens' bureau service, which is already supporting over 500 remote properties, aims to replace the usual instant dispatch requirement of a service engineer. The company says its data indicates that nine out of 10 calls no longer require a service engineer visit.

Increased revenue

The system provides much greater non-payment enforceability with more shut off modes for different resident profiles. It also delivers increased visibility over all components, data-driven performance certainty, and overall improvements in customer service and revenues.

More on Technology

IEA: Battery recycling innovation accelerating rapidly

IEA: Battery recycling innovation accelerating rapidly

Plans to process millions of used batteries in coming decades are continuing to advance

clock 01 May 2026 • 2 min read
Centrica and Delta launch off-grid fuel cell generators for data centres

Centrica and Delta launch off-grid fuel cell generators for data centres

Partners seek to deliver scalable power solutions for energy-intensive sectors where electricity grids are struggling to keep up with demand

clock 30 April 2026 • 2 min read
Plans submitted for 'UK's first' commercial-scale waste-to-hydrogen facility

Plans submitted for 'UK's first' commercial-scale waste-to-hydrogen facility

£120m scheme promises to process 44,000 tonnes of non-recyclable waste a year to produce low-carbon hydrogen for industrial use

clock 29 April 2026 • 2 min read